Saturday, September 2, 2017

BRM 600 - Audax 600km ~ 2017

 

BRM600 – Kuala Selangor - Butterworth - Kuala Selangor
 
Date: Sept 22 - 23

Start Time : 0700 (22/9 Fri) - 2300 (23/9 Sat)

Distance: 610km 
 

This is the Q sheet to follow the route for the whole 600km.
 
 BRM 600 is Malaysia 1st longest cycling event. This is also the most crazy event that i registered. Sound insane but I believe i can complete this challenge. I join the recce ride which is 2 weeks before the actual event. So we cycle in a small group of 15 bike to check the route.

Using my light wheel for this event

Additional bag at the handle bar for over night cloth and sleeper 

We start 0500 from McDonald Kuala Selangor

Sonny got a puncture at kuala selangor  
 
Regroup before Hutal Melintang Junction 

Almost reaching Parit

We have dinner around Taiping area, still have 100km to go
 
Arriving Butterworth 2321
 
This is the best Guinness i ever taste, only have couple of hour to sleep
 
Breakfast at Simpang 
 
 
Nap for 10 mins   
 
Group picture @ Sultan Yusuf Bridge, Teluk Intan 
 
Finally we arrived where we start before COT 

Total mileage of 647km

Victory drink and late dinner @ Kualan Selangor


Cycle till blister  







No comments:

Post a Comment